RoadCase

ROADCASE / TOURING LOGISTICS

Every case.The right truck.Before the doors close.

Log the gear. Build the cases. Plan the truck. Scan what actually leaves. RoadCase keeps the warehouse, crew and production office working from the same record, then turns that work into labels, manifests and freight-ready exports.

  • BETA / ACCESS BY REQUEST
  • PHONE CAMERA / BLUETOOTH HID / MANUAL
  • VENUE IT / 04 HOSTS / TCP 443
LIVE LOAD BOARDTRK-04 / PACK LIVE
QUEUE0
LAST CONTACT14:32
STATUSBUILDABLE
STACK 2C-114LIGHTINGC-082VIDEOC-203AUDIO
STACK 1C-090PRODUCTIONP-042MID / 08C-311BACKLINE
GROUNDC-220POWERC-178RIGGINGC-055CONTROL
PLACED
42 / 56
PAYLOAD
7,840 / 12,000 KG
TALLEST STACK
2.18 M
WARNINGS
1
SCAN FEED
  1. P-042 → TRK-04 / MID-08CAMERA
  2. C-114 → TRK-04 / TOP-04HID
  3. C-082 → TRK-04 / TOP-06CAMERA
  4. C-055 → TRK-04 / GROUND-10MANUAL
  5. C-178 → TRK-04 / GROUND-08HID
CASE P-042P-042 → TRK-04 → MID/08 → READY TO LOAD
  1. 01ITEM
  2. 02CASE
  3. 03TRUCK
  4. 04LOAD
  5. 05FREIGHT

WHY ROADCASE

Touring doesn’t fail in the spreadsheet. It fails in the handoff.

Every time gear changes state (item to case, case to truck, plan to actual) the record can drift away from reality. RoadCase keeps each handoff connected, so the next person is working from the same operational record.

“On the list” is not the same as “on the truck.”
SPREADSHEETCASE LISTTRUCK PLANSCAN LOGFREIGHT HANDOFFONE MOVING RECORD

THE LOAD-OUT / KNOWN FAILURES

Built for the questions that surface at 2 a.m.

Most touring logistics problems are information problems. The gear is fine. The record of where it went is not.

  1. ISSUE 01

    “Which truck is C-114 on?”

    Every case carries its planned truck and deck position on one shared record, so the answer is not locked in one person’s laptop.

    RESOLVED IN02 / PLAN
  2. ISSUE 02

    “Which spreadsheet is the current one?”

    Department imports are staged, reviewed and explicitly committed. After that there is one record, not a folder of versions.

    RESOLVED IN01 / BUILD
  3. ISSUE 03

    “There’s no signal in the dock.”

    Once the manifest is cached, the crew keeps recording movements locally. They sync when the connection returns.

    RESOLVED IN03 / PACK
  4. ISSUE 04

    “That case went on the wrong truck.”

    A scan against the plan catches the mismatch before anything is recorded. An intentional change needs a reason.

    RESOLVED INEXCEPTION
  5. ISSUE 05

    “What actually left the building?”

    The admin board compares the plan with the loaded reality in near real time, backed by a tamper-evident history.

    RESOLVED IN04 / PROVE
  6. ISSUE 06

    “Customs needs the contents sheet by morning.”

    Manifests, contents sheets and the freight workbook come from the same record. Nobody re-keys the load.

    RESOLVED IN05 / HAND OFF

THE WORKFLOW / P-042

One case. Five connected handoffs.

RoadCase keeps the plan and the physical load attached as the work moves from the warehouse to the truck door and on to the freight agent.

01 / BUILD

Start with the gear. Build the case around it.

Import per-department Cases and Items Excel templates, stage the data, review and correct it, then explicitly commit it. Quantities, serials, dimensions, unit weights, values, origins and departments stay attached to the item record.

RoadCase rolls up contents weight and declared value. The operator enters the verified gross weight, then prints a production-branded QR label for the case.

LIGHTING_ITEMS_02.XLSXSTAGED / REVIEW REQUIRED
STATUSITEMSERIALORIGINWTVALUECASE
READYLED ENGINE 4KLE4-1182GB42 KG£8,400P-042
CORRECTEDPROCESSOR 8PX8-0941DE18 KG£6,800P-042
READYFRAME / CABLE SETFC-042GB64 KG£9,600P-042
3 ROWS REVIEWEDEXPLICIT COMMIT →
CONTENTS
124 KG
VERIFIED GROSS
184 KG / OPERATOR
VALUE
£24,800
CASE
P-042
STAGE
01 / BUILD
TRUCK
TRK-04
POSITION
MID/08
GROSS
184 KG
STATE
CASE READY

02 / PLAN

See the truck before the first case rolls.

Place cases on a 2D truck deck across the ground and two stacked tiers. Rotate them, check hard fit and collisions, and watch height and payload as the pack develops.

Auto Pack provides a starting arrangement. Your team refines it and prints the crew sheet.

TRK-04 / 2D DECKPACK BUILDABLE
GROUND + 2 STACKED TIERSROTATION ONHARD FIT CLEARCOLLISION CLEAR
STACK 2C-114LIGHTINGC-082VIDEOC-203AUDIO
STACK 1C-090PRODUCTIONP-042MID / 08C-311BACKLINE
GROUNDC-220POWERC-178RIGGINGC-055CONTROL
PLACED
42 / 56
PAYLOAD
7,840 / 12,000 KG
FLOOR
68%
HEIGHT
2.18 M
WARNINGS
1
UNPLACED / 14C-012C-017C-208+11
AUTO PACK / STARTING ARRANGEMENTROTATE 90°PRINT CREW SHEET ↗
CASE
P-042
STAGE
02 / PLAN
TRUCK
TRK-04
POSITION
MID/08
GROSS
184 KG
STATE
READY TO LOAD

03 / PACK

Keep the pack moving.

Use a phone camera, a compatible Bluetooth HID reader, or manual entry. Every method feeds the same movement record, so the crew can use the capture method that fits the job.

Once the manifest is cached, movements can be recorded locally when service drops and synced when the connection returns.

Camera and scanner availability depends on the device, browser and reader.

QUEUE0
LAST CONTACT14:32
CONNECTIONOFFLINE
MANIFESTSTALE / 04M
PHONE CAMERABLUETOOTH HIDMANUAL ENTRY
READY TO SCANP-042FRAME CASE CODE

ASSIGNMENT MATCHED

P-042 → TRK-04
POSITION
MID/08
EVENT
LOCAL RECORD
SYNC
QUEUED
READY FOR NEXT CASE
CASE
P-042
STAGE
03 / PACK
TRUCK
TRK-04
POSITION
MID/08
GROSS
184 KG
STATE
RECORDED LOCAL
DOCK 02PACKING TRK-02PACKING LIVE

ASSIGNMENT MISMATCH / ACTION REQUIRED

P-042 is planned for TRK-04.

You are packing TRK-02.NOTHING RECORDED
TAKE CASE TO TRK-04OVERRIDE + ADD REASON

PLAN MISMATCHAn intentional change can continue with a reason recorded against the movement.

LOADED ELSEWHEREA case already loaded on another truck is hard blocked until it is unloaded there.

DUPLICATEA repeat scan resolves the existing movement instead of creating another.

04 / PROVE

Know what actually left.

Compare the plan with the loaded reality while the pack is moving. A near-real-time admin board shows assigned and loaded cases, weight, value and reconciliation status.

Recorded reasons and a tamper-evident history help the team understand what changed without rewriting the operational past.

TRK-04 / LOAD RECONCILIATIONIN PROGRESS
ASSIGNED56
LOADED42
WEIGHT7,840 KG
VALUE£1.42M
RECONCILIATION75%
42 LOADED14 REMAIN
RECENT MOVEMENT / EVENT 00042P-042
FROM
DOCK 02
TO
TRK-04 / MID-08
METHOD
CAMERA
RECORDED
14:32:18

ASSIGNMENT MATCHED / LOADED

C-311 TRK-04 / MID-10 LOADEDP-042 TRK-04 / MID-08 LOADEDC-220 TRK-04 / GROUND-06 LOADED
CASE
P-042
STAGE
04 / PROVE
TRUCK
TRK-04
POSITION
MID/08
GROSS
184 KG
STATE
LOADED

05 / HAND OFF

Do the work once. Build every output from it.

Produce production-branded labels, draft and loaded manifests, dock and customs contents sheets, truck signs, session QR codes, Truck Pack crew sheets, and configurable Items, Cases and Trucks CSV exports.

For the freight agent, export a Rockit Cargo XLSX workbook with one tab per carnet grouping, using the plan or loaded reality.

RoadCase prepares the freight data. The freight agent handles the official ATA Carnet.

OUTPUT TRAY / P-0427 OUTPUTS READY
STADIUM TOURVIDEO

MAIN STAGE LEFT

P-042

LED PROCESSING

DIMS
1000 x 600 x 900 mm39 x 24 x 35 in
WEIGHT
184 kg406 lbs
TRUCK
TRK-04MID / 08

LABEL / FICTIONAL SAMPLE

  1. 01PRODUCTION QR LABELSELECTED
  2. 02LOADED MANIFESTPDF
  3. 03DOCK / CUSTOMS CONTENTSPDF
  4. 04TRUCK SIGN / SESSION QRPRINT
  5. 05TRUCK PACK CREW SHEETPRINT
  6. 06ITEMS / CASES / TRUCKSCSV
  7. 07ROCKIT CARGO / CARNET GROUPSXLSX
CASE
P-042
STAGE
05 / HAND OFF
TRUCK
TRK-04
POSITION
MID/08
GROSS
184 KG
STATE
OUTPUTS READY

ROADCASE / SYSTEM MANIFEST

Everything between the item list and the freight handoff.

01INV

Inventory

  • Per-department Cases and Items Excel templates
  • Staged review, correction and explicit commit
  • Quantity, serial, manufacturer and department
  • Dimensions, unit weight, value and origin
SOURCE
02CAS

Cases

  • Item-to-case allocation and complete contents
  • Contents weight and declared-value rollups
  • Operator-entered verified gross weight
  • Handling flags and production-branded QR labels
CONNECTED
03TRK

Truck Pack

  • 2D ground layout plus two stacked tiers
  • Rotation, hard fit and collision checks
  • Payload and height warnings
  • Auto Pack starting arrangement and crew sheet
PLANNED
04FLD

Field

  • Phone camera, Bluetooth HID and manual capture
  • Local recording after the manifest is cached
  • Plan-mismatch handling with a recorded reason
  • Reconciliation against the loaded reality
RECORDED
05OUT

Outputs

  • Labels, manifests and contents sheets
  • Truck signs, session QR codes and crew sheets
  • Configurable Items, Cases and Trucks CSV exports
  • Rockit Cargo XLSX workbook for the freight agent
READY

ROADCASE / TOURING LOGISTICS

Every handoff, clear.

From the first item record to the freight workbook, RoadCase keeps the plan, the pack, the proof and the paperwork connected.

  • BETA / ACCESS BY REQUEST
  • PHONE CAMERA / BLUETOOTH HID / MANUAL
  • VENUE IT / 04 HOSTS / TCP 443